Quality
Where each batch is measured, and what happens when a figure falls outside the customer specification.

Checkpoints
Incoming coil
Every aluminium coil arrives with a chemical composition certificate from the supplier, and a sample from each coil is tested before it goes into production. A certificate is a claim; the sample is the check.
Drawing
Diameter is gauged continuously while the wire is drawn, not sampled at the end. A wire that runs thin for twenty metres passes an end-of-batch check and fails on the customer's film.
Degreasing
Drawing oils and residue are removed after drawing. What is left on the surface ends up in the vacuum chamber.
Layer winding
Wire is wound layer to layer on the spool, jointless, so it pays off an automatic metalliser without an operator re-threading it mid-run.
Batch tensile test
Tensile strength of every batch is tested in house on a tensile machine and recorded against the customer's specification. A batch outside it does not ship.
Packing
Spools are packed in corrugated boxes to the customer's requirement and shipped by road or by sea.
Certifications
Certifications to be confirmed.